Reasons for HV Cable Termination Kit Failure- Part-1

Introduction:

  • High voltage cables are used in Electrical Network for Power Transmission and distribution.
  • Cable termination failure / faults are major problem in electrical networks.
  • Power cable joints and terminations are the weakest link in Electrical Network. The higher the voltage the more complexity in the cable joints and terminations hence more difficult to control thermal and electrical stresses.
  • There are many reasons that cause breakdown in cable termination. Like Poor Termination, Poor preparation of Semiconductive layer, Moisture, partial discharge, excessive bending, Not following instruction of Cable Termination kit’s manufacture.

Main Reason for HT Termination Failure:

(A) Workmanship Error / Assembly Errors

  1. Excessive Bending of Cable
  2. Crossing of Cable Core to each other
  3. Sharp Corners
  4. Not Proper Heating of Heat Shrinkable Sleeves
  5. Excess Heating of Heat Shrinkable Sleeves
  6. Loose Connections
  7. Poor Installation of Mastic Tapes.
  8. Not following Manufacture’s Instruction.

(B) Poor Earthing of Cable

  1. Poor Termination of Steel wire Armored
  2. Poor Earthing of Cable

(C) Poor Preparation of Semi Conductive Layer

  1. Damaged of XLPE Insulation.
  2. Damaged of Semi Conductive Insulation.
  3. Incomplete removal of Semi conductive layer
  4. Not Radial edge of Semi conductive layer
  5. Wrong Cutback Length of Insulation / Semi conductive layer
  6. Not Proper installation of Stress Control Tubes.
  7. Extreme rough Surface of XLPE Insulation.
  8. Not Proper Cleaning of XLPE Insulation Surface

(D) Damage of Cable

  1. Damaged of Cable during Cable Termination Process

(E) Worse environment condition

  1.  Contamination of salt, dust, ash on Cable

(A) Workmanship Error / Assembly Errors

(1) Excessive Bending of Cable

  • Excessive bending of the cable creates stress on the entire cable core, from the conductor to the shielding end.
  • This stress can cause micro voids in the insulator which become larger as stress is increased and lead to an eventual corona failure or dielectric breakdown.

A

(2) Cross over Cable Core / Not proper distance between each core.

  • Cable entry points through the cable gland plate to cable termination should be centralized / straight.
  • Crossing of cores to each other will increase stress over insulation and partial discharge will occur at the crossed cores of the HV cable causing failure of the cable termination.
  • if cores are too close and cross to each other at unscreened area results in the air “breaking down” at approximately 4kV on an 11kV cable, 6kV on a 24kV cable and 9kV on 36kV cable.
  • The anti-track heat shrink material then begins to erode due to the ionisation of the air, which over time will inevitably cause failure of the cable termination
  • Required to use proper Phase out the cable sections in the box.

B

(3) Sharp Corners (at Armor or at Lugs):

  • Sharp corners generate highly stressed area which will be subjected to electrical discharge.
  • Normally Sharp edge will occur at armour bending or at Location of Lug’s crimping.

(4) Not Proper application of Heat-on-Heat Shrinkable Sleeves

  • Proper Amount Heat and direction of applied Heat is very important during Installation of Heat shrinkable Sleeve.
  • Some Sleeve need to be heated from central to both up and down direction while in some sleeve heat should be applied from bottom of sleeve to end termination direction.
  • Heating process firmly joint one layers (silicon rubber) to the others layer (XLPE, semiconductor and etc).

C

  • If during heating, voids remain between the layers, The voids may contain air, wet or contaminations which change equivalent circuit and formation of electric field distribution.
  • Electric field increases in the void or the layer of air and makes a high potential difference between both sides of the void. Insulation endurance weakness in the layer of air causes Partial Discharge (PD) and breakdown.
  • Make sure that the tubes are shrunk free from wrinkles

(5) Excess Heat on Heat Shrinkable Sleeves

  • Excessive Heat may damage the heat shrinkable sleeve.

(6) Loose Connections

  • 20% to 25% of electrical failures due to poor termination and loose connections.
  • The poor termination / loose connection in an electrical system causes overheating at the joints which further leads to failure.
  • Loose connection is mostly raised due to Using improperly crimped tool / die for the cables.
  • Lugs of higher than recommended size used for termination will also in results of loose cable to lug joint.

 (7) Poor Installation of Mastic Tapes.

  • Anti-Tracking mastic sealing tape is used in HV and MV terminations for providing a water-tight seal between heat shrink components and the cable parts.
  • Wrapping mastic tape around crotch and under lead cut on core to eliminate air and moisture.
  • Any improper wrapping of Mastic Tap leads the path for moisture and Air which result in high electrical stress and partial discharge.

 (8) Not following Manufacture’s Instruction.

  • In HV Cable Termination each and every stage is crucial hence cable jointer should strictly follow manufactures instruction.
  • Not following manufacture’s instruction regarding length, dimension and sequence of stage will create cable termination failure.
  • In flowing image, Cable Termination Kit Manufacture clearly indicate that 5mm of yellow mastic is to be installed on the copper tape screen and to continue over the semi conductive layer and then finish 10mm onto the cable installation.
  • The yellow mastic is used to fill voids and provides stress relief from electrical fields so it is essentialthis is installed correctly but Cable Jointer applied it at wrong location.

D

(B) Poor Earthing of Cable

(1)  Poor Termination of Steel wire Armored

  •  Poor termination of the Cable amour strip/ Wire is one of the reasons for failure of Cable Termination Kit.
  • When terminating cables with heat shrink cable terminations there is a need to ensure safe earthing and termination of the armour wires (SWA steel wire armour) using cable glands.
  • In most HV cable installations the cable gland body can be installed after completion of the Cable terminations. Completion of the final 11kV connections should be done before bolting the cable gland into place on the 11kV cable box.

 (2) Not proper earthing of Cable

  • Earthing must be provided to carry any circulating currents to core screens, metal sheaths and armour wires.
  • It must also have the ability to carry fault current. On indoor MV HV cable terminations the use of tin-plated copper, solder-blocked braids, metal canisters, armour support, clamps and a complete corrosion protection system should be employed.

6 Responses to Reasons for HV Cable Termination Kit Failure- Part-1

  1. Dr. Muhammad Mohsin Ansari's avatar Dr. Muhammad Mohsin Ansari says:

    Thanks……Jignesh Parmar

  2. Asad Malik's avatar Asad Malik says:

    Very knowledgeable stuff for skilled workers to understand what precautions should be taken during termination kit execution works.

  3. Thomas's avatar Thomas says:

    Hi Jignesh, I found your article in EEP and I am a member with EEP portal. Your articles are helpful but the spread sheet are password protected. We follow NEC guidelines, the spreadsheet would be helpful if I can make changes with regard to cable selections. Can you pl advice or provide pass word to the spread sheet associated with short circuit calculation at various point of electrical circuits (Isc). Thank you so much.
    Thomas Philips

  4. YELLAI SUBRAMANYAM's avatar YELLAI SUBRAMANYAM says:

    Very very informative

  5. Mr.Tin Aung's avatar Mr.Tin Aung says:

    It’s very useful and precious facts to all termination electrician and engineers.Even they are taken by knowledge from elder experienced master,these masters may be not sure well trained personnel, in some regions will interface many failures in this cable failures. Sometimes suitable toolkit cannot buy local market and available cables (single or three core)not match imported panels are also failures causes I think.we appreciate your lighted up teaching and guidance. We hope that next lesson will more precious for our engineers and technicians.

  6. zarni thein's avatar zarni thein says:

    Thanks a lot Sir.

Leave a Reply

Discover more from Electrical Notes & Articles

Subscribe now to keep reading and get access to the full archive.

Continue reading