Pipe Support Details

Nominal Pipes Diameter

Hanger rod diameter

Hanging Strip Size(thickxwidh)

Spacing between supports

25 mm

8 mm

20 x 1 mm

2 Meter

32 mm

8 mm

20 x 1 mm

2.5 Meter

40 mm

8 mm

20 x 1 mm

2.5 Meter

50 mm

10 mm

25 x 1.2 mm

2.5 Meter

65 mm

10 mm

25 x 1.2 mm

2.5 Meter

80 mm

10 mm

25 x 1.2 mm

2.5 Meter

100 mm*

12 mm

25 x 1.6 mm

2.5 Meter

125 mm*

12 mm

25 x 2 mm

3 Meter

150 mm*

12 mm

25 x 2 mm

3 Meter

* As per Site Requirement Fabrication Support may be used.

Sprinkler Qty

Pipe Size

Min.Sprinkler Qty

Max.Sprinkler Qty

25 mm

1

2

32 mm

3

4

40 mm

5

7

50 mm

8

15

65 mm

16

30

80 mm

31

60

100 mm*

61

100

150 mm*

More than 100

Supporting Chanel & U Bolt

Pipe Size

Chanel

U Bolt Dia

Up to 50 mm

38x38xx6 mm

9 mm

65 To 100 mm

75x75x6 mm

12 mm

125 To 200 mm

88x88x9 mm

15 mm

 

Flange  Details

Pipe Dia

Flange Thickness

No. of holes

200 mm.

24 mm.

12

150 mm and 125 mm

22 mm.

8

100 mm and 80 mm

20 mm.

8

65 mm.

18mm

4

40 mm and below.

16mm

4

Pipe Support Details

MS Angle(mm)

Anchor Faster

Width

40X40X5

12MM

200MM both Side of Pipe

Holiday Test Voltage (IS 15337)

Thickness of Coating

Test Voltage, Max

2 mm

10KV

3 mm

12KV

4 mm

15KV

Recommended Welding Electrode Size

Average Thickness of Plate or Sections

Maximum Electrode Size

Current Range

1.5 To 2.0 mm

2.5 mm

60 To 95 Amp

2.0 To 5.0 mm

3.2 mm

110 To 130 Amp

5.0 To 8.0 mm

4.0 mm

140 To 165 Amp

>8.0 mm

5.0 mm

170 To 260 Amp

3 Responses to Quick Reference-Fire Fighting (Part-3)

  1. Dr. muhammad mohsin ansari's avatar Dr. muhammad mohsin ansari says:

    Thanks……Jignesh.Parmar

  2. Sumesh V's avatar Sumesh V says:

    Sir,
    I am a regular reader of your articles. It is too informative.

    The recommended phase to phase and phase to ground clearance on 11kV DP structure is 915mm and 610mm respectively. Please be kind enough to inform, from where (standard or rule) this value is derived.

  3. Shrikanth Kannan's avatar Shrikanth Kannan says:

    Good morning, Please clarify how to calculate the main power source of the connected load is about 3000 kW

    What should be the main power source capacity and other factors to be considered

    Thanks Best regards Srikanth

    On Sun, 15 Aug, 2021, 9:14 am Electrical Notes & Articles, wrote:

    > Jignesh.Parmar (B.E,Mtech,MIE,FIE,CEng) posted: ” Pipe Support Details > Nominal Pipes Diameter Hanger rod diameter Hanging Strip Size(thickxwidh) > Spacing between supports 25 mm 8 mm 20 x 1 mm 2 Meter 32 mm 8 mm 20 x 1 mm > 2.5 Meter 40 mm 8 mm 20 x 1 mm 2.5 Me” >

Leave a Reply

Discover more from Electrical Notes & Articles

Subscribe now to keep reading and get access to the full archive.

Continue reading