Sub Station Abstract- (Part-3)

Electrical Wire Ground Clearance:

  • Ground Clearance in Meter = 5.812 + 0.305 X K

  • Where K= (Volt-33) / 33
Voltage Level Ground Clearance
<=33KV 5.2  Meter
66KV 5.49 Meter
132KV 6.10 Meter
220KV 7.0   Meter
400KV 8.84  Meter

Overhead Conductor /Cable Size:

Voltage

Overhead Conductor

Cable Size

33 KV ACSR-Panther/Wolf/Dog , AAAC 150,185,300,400,240 mm2 Cable
11 KV ACSR-Dog/Recon/Rabbit , AAAC 120, 150,185,300 mm2 Cable
LT ACSR-Dog/Recon/Rabbit , AAC,AAAC 95,120, 150,185,300 mm2 Cable

 Transmission / Distribution Line:

Span

Height of Tower

400KV=400 Meter

400KV=30Meter (Base 8.8 Meter)

220KV=350 Meter

220KV=23Meter (Base 5.2 Meter)

132KV=335 Meter

220KV Double Circuit=28 Meter

66KV=210 Meter

66KV=13Meter

Conductor Ampere

Voltage wise Conductor

Dog=300Amp

400KV=Moose ACSR=500MVA Load

Panther=514Amp

220KV=Zebra ACSR=200MVA Load

Zebra=720Amp

132KV=Panther ACSR=75MVA Load

Rabbit=208Amp

66KV=Dog ACSR=50MVA Load

Moose=218Amp

 

 Type of Tower:

Type

Used

Angle/Deviation

A

Suspension Tower Up to 2°

B

Small Angle Tower 2° to 15°

C

Medium Angle Tower 15° to 30°

D

Large Angle / Dead End Tower 30° to 60° & Dead End

 Tower Swing Angle Clearance (Metal Part to Live Part):

Swing Angle

Live Part to Metal Part Clearance (mm)

66KV

132KV

220KV

400KV

915mm

1530mm

2130mm

3050mm

15°

915mm

1530mm

2130mm

22°

3050mm

30°

760mm

1370mm

1830mm

44°

1860mm

44°

610mm

1220mm

1675mm

Corona Ring Size:

Voltage

Size

<170 KV 160mm Ring put at HV end
>170 KV 350mm Ring put at HV end
>275 KV 450mm Ring put at HV end & 350 mm Ring put at Earth end

 

Span of Transmission Line (Central Electricity Authority):

Voltage

Normal Span

765 KV

400 to 450 Meter

400 KV

400 Meter

220 KV

335,350,375 Meter

132 KV

315,325,335 Meter

66 KV

240,250,275 Meter

 

 

11 Responses to Sub Station Abstract- (Part-3)

  1. PRASHANT SONI's avatar PRASHANT SONI says:

    THANK YOU SO MUCH SIR… THANK U FOR UE VALUABLE HELP….

    Your work gives so much precious knowledge to the whole electrical engineers who are freshers or with lack of practical knowledge..

  2. Ritaban Banerjee's avatar Ritaban Banerjee says:

    Thanks for such a compact valuable information.

  3. Sarvan Kumar's avatar Sarvan Kumar says:

    thank you sir

  4. walid salman's avatar walid salman says:

    Hi.
    I tried to buy the electrical software but in the countries of paypall there is no lebanon country the system refuse the credit card.
    What should I do?

  5. dilshad ahmad's avatar dilshad ahmad says:

    Thanks! to send me notes & articles.but my feiled is distrybution transformer if related my job notes pl send me

  6. joe c.'s avatar joe c. says:

    Please I have a 300kvar capacitor bank for a 800kva transformer.
    What would be the implication of the voltage raise to the Factory electrical systems
    and operations? Help please

  7. raja's avatar raja says:

    classics with best selection

  8. Eng.ahmed Hashem's avatar Eng.ahmed Hashem says:

    Dear Sir,

    Thank you very much for these valuable technical information.

    Regards, Ahmad H. Al-Sheikh Power System Engineer. Saudi Arabia

  9. ganeshkumar's avatar ganeshkumar says:

    if we by mistaken extra capacitor in circuits .circuit voltage and transformer voltage level rise at that time problem will occur .right sir?

  10. bhagvat vala's avatar bhagvat vala says:

    Plz send me mail related variable frequency drive

  11. eswaran's avatar eswaran says:

    thank for your guidance

Leave a Reply

Discover more from Electrical Notes & Articles

Subscribe now to keep reading and get access to the full archive.

Continue reading